Fire-stop penetration seals in Dinslaken

Dinslaken needs penetration seals that hold the fire-compartment boundary, pass the inspection, get signed off.

Promat · Hilti · WürthExisting & newAudit-ready documentation
Dinslaken

What a penetration seal achieves.

Every wall penetration in Dinslaken that crosses a fire-compartment boundary needs documentation: installer. Consultants check this every year. Insurers reference it after a loss. A missing seal is the kind of finding that gets cited in damage reports.

Penetration systems for Dinslaken.

We combine Promat, Hilti and Würth — system-open, brand-neutral in Dinslaken.

  1. 01

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan. Audit-ready in Dinslaken.

  2. 02

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution.

  3. 03

    Cable seal in wall

    Classic in Dinslaken stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Documented in the property log in Dinslaken.

  4. 04

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  5. 05

    Stock documentation

    Take over multi-brand stock in Dinslaken, consolidate in the penetration plan, prepare for consultant sign-off. Audit-ready in Dinslaken.

  6. 06

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables.

Where we install seals in Dinslaken.

Stock survey
Take over multi-brand stock in Dinslaken, inspect, transfer into penetration plan, prepare for authorities. Standard scope in Dinslaken.
Cable trays
Tray penetrations with box seals or aggregate seals.
Duct lines
Fire dampers, duct seals — schools, care, offices in Dinslaken. Standard scope in Dinslaken.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Dinslaken. Standard scope in Dinslaken.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Dinslaken.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.

Standards.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Dinslaken.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Dinslaken buildings.

What penetration seals cost in Dinslaken.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Dinslaken

Fixed offer after walkthrough in Dinslaken.

Fire stops in Dinslaken — FAQ.

  • Yes — as long as each position has an approval and the documentation is consistent. We take over stock brand-neutrally.

Have your seals checked for Dinslaken.

Walkthrough in Dinslaken → defect list → fixed offer.

Call+49 2861 8114387