Fire-stop penetration seals in Hünxe

Wall and ceiling penetrations in Hünxe sealed audit-ready, installed to approval, tracked in penetration plans for the consultant's sign-off.

Promat · Hilti · WürthExisting & newAudit-ready documentation
Hünxe

What a penetration seal achieves.

An F90-rated wall in Hünxe loses its function the instant a cable, pipe or duct passes through it unsealed. Only the approved penetration seal restores that fire resistance — and only if the system used matches the cable density.

Penetration systems for Hünxe.

We combine Promat, Hilti and Würth — system-open, brand-neutral in Hünxe.

  1. 01

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Documented in the property log in Hünxe.

  2. 02

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

  3. 03

    Stock documentation

    Take over multi-brand stock in Hünxe, consolidate in the penetration plan, prepare for consultant sign-off.

  4. 04

    Cable seal in wall

    Classic in Hünxe stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Specified per approval in Hünxe.

  5. 05

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line. Documented in the property log in Hünxe.

  6. 06

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Specified per approval in Hünxe.

Where we install seals in Hünxe.

Cable trays
Tray penetrations with box seals or aggregate seals. Standard scope in Hünxe.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus. Standard scope in Hünxe.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Hünxe. Standard scope in Hünxe.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Hünxe.
Stock survey
Take over multi-brand stock in Hünxe, inspect, transfer into penetration plan, prepare for authorities. Standard scope in Hünxe.
Duct lines
Fire dampers, duct seals — schools, care, offices in Hünxe.

Standards.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Hünxe.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Hünxe buildings.

What penetration seals cost in Hünxe.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Hünxe

Fixed offer after walkthrough in Hünxe.

Fire stops in Hünxe — FAQ.

  • A penetration plan documents every seal in the building — location, system, date, installer. Mandatory for public buildings, special-use, larger properties in Hünxe.

Have your seals checked for Hünxe.

Walkthrough in Hünxe → defect list → fixed offer.

Call+49 2861 8114387