Fire-stop penetration seals in Kalkar

Kalkar needs penetration seals that hold the fire-compartment boundary, pass the inspection, get signed off.

Promat · Hilti · WürthExisting & newAudit-ready documentation
Kalkar

What a penetration seal achieves.

Penetration seals are DIN-validated closures of wall and ceiling openings. They hold the rated wall's integrity for the same duration the wall itself is rated for — 30, 60 or 90 minutes. Without a seal, every cable, pipe or duct that crosses the wall becomes a weak point for flames and smoke.

Penetration systems for Kalkar.

We combine Promat, Hilti and Würth — system-open, brand-neutral in Kalkar.

  1. 01

    Cable seal in wall

    Classic in Kalkar stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Audit-ready in Kalkar.

  2. 02

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Documented in the property log in Kalkar.

  3. 03

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  4. 04

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan. Documented in the property log in Kalkar.

  5. 05

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables.

  6. 06

    Stock documentation

    Take over multi-brand stock in Kalkar, consolidate in the penetration plan, prepare for consultant sign-off. Audit-ready in Kalkar.

Where we install seals in Kalkar.

Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Kalkar.
Duct lines
Fire dampers, duct seals — schools, care, offices in Kalkar. Standard scope in Kalkar.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Kalkar.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.
Stock survey
Take over multi-brand stock in Kalkar, inspect, transfer into penetration plan, prepare for authorities. Standard scope in Kalkar.
Cable trays
Tray penetrations with box seals or aggregate seals. Standard scope in Kalkar.

Standards.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Kalkar.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Kalkar buildings.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

What penetration seals cost in Kalkar.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Kalkar

Fixed offer after walkthrough in Kalkar.

Fire stops in Kalkar — FAQ.

  • Yes — as long as each position has an approval and the documentation is consistent. We take over stock brand-neutrally.

Have your seals checked for Kalkar.

Walkthrough in Kalkar → defect list → fixed offer.

Call+49 2861 8114387