Fire-stop penetration seals in Goch

Sealing what needs to be sealed in Goch and Kreis Kleve. Cable seals, pipe stops, combined penetrations. Soft, hard or mortar seals.

Promat · Hilti · WürthExisting & newAudit-ready documentation
Goch

What a penetration seal achieves.

Every wall penetration in Goch that crosses a fire-compartment boundary needs documentation: approval number. Consultants check this every year. Insurers reference it after a loss. A missing seal is the kind of finding that delays sign-off.

Penetration systems for Goch.

We combine Promat, Hilti and Würth — system-open, brand-neutral in Goch.

  1. 01

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

  2. 02

    Stock documentation

    Take over multi-brand stock in Goch, consolidate in the penetration plan, prepare for consultant sign-off.

  3. 03

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Audit-ready in Goch.

  4. 04

    Cable seal in wall

    Classic in Goch stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Specified per approval in Goch.

  5. 05

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  6. 06

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Documented in the property log in Goch.

Where we install seals in Goch.

Cable trays
Tray penetrations with box seals or aggregate seals.
Stock survey
Take over multi-brand stock in Goch, inspect, transfer into penetration plan, prepare for authorities.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Goch.
Duct lines
Fire dampers, duct seals — schools, care, offices in Goch.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Goch. Standard scope in Goch.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.

Standards.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Goch.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Goch buildings.

What penetration seals cost in Goch.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Goch

Fixed offer after walkthrough in Goch.

Fire stops in Goch — FAQ.

  • At least annually as part of maintenance — and after every cable/pipe change. Maintenance log mandatory in Goch.

Have your seals checked for Goch.

Call us — we take over the seal stock in Goch and continue it.

Call+49 2861 8114387