Fire-stop penetration seals in Wilnsdorf

Wilnsdorf needs penetration seals that hold the fire-compartment boundary, pass the inspection, get signed off.

Wall · ceilingS30 · S60 · S90With penetration plan
Wilnsdorf

What a penetration seal achieves.

The right system depends on context. Mineral wool with coating handle most wall penetrations in Wilnsdorf stock; fire boards go in for when frequent re-cabling is expected. Combined cable+pipe penetrations need a system that's documented in the penetration plan.

Penetration systems for Wilnsdorf.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Cable seal in wall

    Classic in Wilnsdorf stock: cables through F30/F90 wall, mineral wool with coating or board with collars.

  2. 02

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

  3. 03

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Specified per approval in Wilnsdorf.

  4. 04

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  5. 05

    Stock documentation

    Take over multi-brand stock in Wilnsdorf, consolidate in the penetration plan, prepare for consultant sign-off. Documented in the property log in Wilnsdorf.

  6. 06

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables.

Where we install seals in Wilnsdorf.

Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Wilnsdorf. Standard scope in Wilnsdorf.
Stock survey
Take over multi-brand stock in Wilnsdorf, inspect, transfer into penetration plan, prepare for authorities.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus. Standard scope in Wilnsdorf.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Wilnsdorf.
Duct lines
Fire dampers, duct seals — schools, care, offices in Wilnsdorf.
Cable trays
Tray penetrations with box seals or aggregate seals. Standard scope in Wilnsdorf.

Standards.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Wilnsdorf.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Wilnsdorf buildings.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

What penetration seals cost in Wilnsdorf.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Wilnsdorf

Fixed offer after walkthrough in Wilnsdorf.

Fire stops in Wilnsdorf — FAQ.

  • At least annually as part of maintenance — and after every cable/pipe change. Maintenance log mandatory in Wilnsdorf.

Have your seals checked for Wilnsdorf.

Walkthrough in Wilnsdorf → defect list → fixed offer.

Call+49 2861 8114387