What a penetration seal achieves.

Every wall penetration in Netphen that crosses a fire-compartment boundary needs documentation: installer. Consultants check this every year. Insurers reference it at renewal. A missing seal is the kind of finding that gets cited in damage reports.

Penetration systems for Netphen.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

  2. 02

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution.

  3. 03

    Cable seal in wall

    Classic in Netphen stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Documented in the property log in Netphen.

  4. 04

    Stock documentation

    Take over multi-brand stock in Netphen, consolidate in the penetration plan, prepare for consultant sign-off. Documented in the property log in Netphen.

  5. 05

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line. Audit-ready in Netphen.

  6. 06

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Documented in the property log in Netphen.

Where we install seals in Netphen.

Duct lines
Fire dampers, duct seals — schools, care, offices in Netphen. Standard scope in Netphen.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Netphen. Standard scope in Netphen.
Cable trays
Tray penetrations with box seals or aggregate seals.
Stock survey
Take over multi-brand stock in Netphen, inspect, transfer into penetration plan, prepare for authorities.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus. Standard scope in Netphen.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Netphen.

Standards.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Netphen buildings.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Netphen.

What penetration seals cost in Netphen.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Netphen

Fixed offer after walkthrough in Netphen.

Fire stops in Netphen — FAQ.

  • Yes — as long as each position has an approval and the documentation is consistent. We take over stock brand-neutrally.

Have your seals checked for Netphen.

Walkthrough in Netphen → defect list → fixed offer.

Call+49 2861 8114387