Fire-stop penetration seals in Velbert

Velbert needs penetration seals that hold the fire-compartment boundary, pass the inspection, get signed off.

Walkthrough in VelbertDefect list includedFixed offer
Velbert

What a penetration seal achieves.

Penetration seals are approved closures of wall and ceiling openings. They preserve the fire compartment for the same duration the wall itself is rated for — 30, 60 or 90 minutes. Without a seal, every cable, pipe or duct that crosses the wall becomes a direct path for flames and smoke.

Penetration systems for Velbert.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  2. 02

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables.

  3. 03

    Cable seal in wall

    Classic in Velbert stock: cables through F30/F90 wall, mineral wool with coating or board with collars.

  4. 04

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution.

  5. 05

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

  6. 06

    Stock documentation

    Take over multi-brand stock in Velbert, consolidate in the penetration plan, prepare for consultant sign-off. Specified per approval in Velbert.

Where we install seals in Velbert.

Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Velbert.
Cable trays
Tray penetrations with box seals or aggregate seals.
Stock survey
Take over multi-brand stock in Velbert, inspect, transfer into penetration plan, prepare for authorities. Standard scope in Velbert.
Duct lines
Fire dampers, duct seals — schools, care, offices in Velbert.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Velbert. Standard scope in Velbert.

Standards.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Velbert.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Velbert buildings.

What penetration seals cost in Velbert.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Velbert

Fixed offer after walkthrough in Velbert.

Fire stops in Velbert — FAQ.

  • A penetration plan documents every seal in the building — location, system, date, installer. Mandatory for public buildings, special-use, larger properties in Velbert.

Have your seals checked for Velbert.

Walkthrough in Velbert → defect list → fixed offer.

Call+49 2861 8114387