Fire-stop penetration seals in Mettmann

Mettmann needs penetration seals that hold the fire-compartment boundary, pass the inspection, get signed off.

Walkthrough in MettmannDefect list includedFixed offer
Mettmann

What a penetration seal achieves.

Penetration seals are approved closures of wall and ceiling openings. They hold the rated wall's integrity for the same duration the wall itself is rated for — 30, 60 or 90 minutes. Without a seal, every cable, pipe or duct that crosses the wall becomes a direct path for flames and smoke.

Penetration systems for Mettmann.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Cable seal in wall

    Classic in Mettmann stock: cables through F30/F90 wall, mineral wool with coating or board with collars.

  2. 02

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

  3. 03

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution.

  4. 04

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Documented in the property log in Mettmann.

  5. 05

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  6. 06

    Stock documentation

    Take over multi-brand stock in Mettmann, consolidate in the penetration plan, prepare for consultant sign-off.

Where we install seals in Mettmann.

Cable trays
Tray penetrations with box seals or aggregate seals.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Mettmann.
Stock survey
Take over multi-brand stock in Mettmann, inspect, transfer into penetration plan, prepare for authorities.
Duct lines
Fire dampers, duct seals — schools, care, offices in Mettmann. Standard scope in Mettmann.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus. Standard scope in Mettmann.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Mettmann.

Standards.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Mettmann.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Mettmann buildings.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

What penetration seals cost in Mettmann.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Mettmann

Fixed offer after walkthrough in Mettmann.

Fire stops in Mettmann — FAQ.

  • Yes — open seal, add cable, reseal. Standard service in Mettmann.

Have your seals checked for Mettmann.