Every cladding with approval and conformity declaration.
Documentation is mandatory. Every cladding position needs system reference. We deliver this with the work — so the Unna consultant can sign off without chasing missing data.
Unna has steel halls, ventilation runs and load-bearing structures that must keep their function under fire. We install, renovate, document audit-ready.

Documentation is mandatory. Every cladding position needs system reference. We deliver this with the work — so the Unna consultant can sign off without chasing missing data.
What we install in Unna depends on the structure, appearance and construction phase.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.
Intumescent coating — for visible steelwork, where boards would interfere visually.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Unna industrial settings.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Unna.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Unna. Documented in the property log in Unna.
Every cladding with approval and conformity declaration.
EI ratings for claddings — parallel to DIN, EU-recognised.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Unna.
For special-use buildings, in maintenance plans, at renovation completion — yes. Documentation in Unna provided.
Survey in Unna → board order → install. Documentation audit-ready.