Every cladding with approval and conformity declaration.
Fire claddings are coated build-ups that protect steel beams from load loss for 30 to 120 minutes. The cladding turns an combustible timber into an F30/F90-compliant component.
Cladding steelwork, lining ventilation ducts, retrofitting load-bearing structures in Fröndenberg. Boards, coatings, mineral-wool systems.

Fire claddings are coated build-ups that protect steel beams from load loss for 30 to 120 minutes. The cladding turns an combustible timber into an F30/F90-compliant component.
What we install in Fröndenberg depends on the structure, appearance and construction phase.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Fröndenberg industrial settings.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary. Audit-ready in Fröndenberg.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Fröndenberg. Specified per approval in Fröndenberg.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Fröndenberg. Specified per approval in Fröndenberg.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.
Intumescent coating — for visible steelwork, where boards would interfere visually. Specified per approval in Fröndenberg.
Every cladding with approval and conformity declaration.
EI ratings for claddings — parallel to DIN, EU-recognised.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Fröndenberg.
For special-use buildings, in maintenance plans, at renovation completion — yes. Documentation in Fröndenberg provided.
Survey in Fröndenberg → board order → install. Documentation audit-ready.