Defines the S-rating for cable seals in Schmallenberg buildings.
An F90-rated wall in Schmallenberg loses its function the moment a cable, pipe or duct passes through it unsealed. Only the tested penetration seal restores that fire resistance — and only if the system used matches the opening size.

