Fire-protective claddings in Neuenkirchen

Load-bearing structures keep their fire-resistance rating through approved board claddings, fire-protective coatings or mineral-wool build-ups — installed in Neuenkirchen and Region Reg.-Bez. Münster.

Request survey+49 2861 8114387
Promatect · Knauf · HiltiSurvey in NeuenkirchenFixed offer
Neuenkirchen

What fire cladding does.

Fire claddings are board constructions that protect load-bearing components from heating for 30 to 120 minutes. The cladding turns an unprotected steel beam into an properly rated structural element.

Cladding types for Neuenkirchen.

What we install in Neuenkirchen depends on the structure, appearance and construction phase.

  1. 01

    Fire-protective coating

    Intumescent coating — for visible steelwork, where boards would interfere visually. Documented in the property log in Neuenkirchen.

  2. 02

    Shaft cladding

    Lift shafts or service shafts — F90 outside, F30 inside, per concept in Neuenkirchen.

  3. 03

    Duct cladding

    Promatect-L or equivalent — fully enclosing the duct, per approval, in Neuenkirchen industrial settings.

  4. 04

    Steel beam F30/F90

    Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Specified per approval in Neuenkirchen.

  5. 05

    Timber beam protection

    F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Neuenkirchen.

  6. 06

    Sprayed plaster

    Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.

Where we cladding in Neuenkirchen.

Timber ceiling
Stock cladding for timber-beam ceilings — F30/F60 underside in Neuenkirchen stock. Standard scope in Neuenkirchen.
Service shaft
Heating, sewage, ventilation shaft — F90 cladding with inspection openings. Standard scope in Neuenkirchen.
Lift shaft
F90 shaft wall with cladding — for stock renovation, top-up storeys, new build in Neuenkirchen. Standard scope in Neuenkirchen.
Duct lines
Ventilation ducts in school, care, office buildings in Neuenkirchen — F90 cladding all-round.
Stairwell structure
Steel staircases with F30 cladding — in stock, new build, as renovation measure.
Hall load-bearing
Steel beams in logistics and production halls in Neuenkirchen — F30 to F90 per concept, audit-ready. Standard scope in Neuenkirchen.

Standards.

  • DIN 4102-4
    Components under fire

    F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.

  • MLAR
    Cable line directive

    Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.

  • abZ
    Building-authority approval

    Every cladding with approval and conformity declaration.

  • EN 13501-2
    EU classification

    EI ratings for claddings — parallel to DIN, EU-recognised.

What fire claddings cost in Neuenkirchen.

Heavily dependent on component and area — fixed price after survey.

  • from €60/m
    Steel beam F30 board claddingPer linear metre, three-sided
  • €120 – €250/m²
    Duct cladding F90All-round, in line
  • from €80/m²
    Shaft wall F90Lift shaft / service
  • Fixed price
    Timber-beam upgradeLump-sum after walkthrough in Neuenkirchen
  • On request
    Fire-protective coatingPer m² visible area, intumescent

Fixed offer after survey in Neuenkirchen.

Claddings in Neuenkirchen — FAQ.

  • For special-use buildings, in maintenance plans, at renovation completion — yes. Documentation in Neuenkirchen provided.

Plan claddings for Neuenkirchen.

Survey in Neuenkirchen → board order → install. Documentation audit-ready.

Call+49 2861 8114387