Every cladding with approval and conformity declaration.
Fire claddings are mineral-wool systems that protect steel beams from load loss for 30 to 120 minutes. The cladding turns an bare duct into an building-authority-approved bauteil.
Fire claddings for steel beams, timber elements and ventilation ducts in Metelen. F30, F90 and higher — approved Promatect, Knauf fire systems.

Fire claddings are mineral-wool systems that protect steel beams from load loss for 30 to 120 minutes. The cladding turns an bare duct into an building-authority-approved bauteil.
What we install in Metelen depends on the structure, appearance and construction phase.
Intumescent coating — for visible steelwork, where boards would interfere visually.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Metelen.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Metelen industrial settings.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Metelen.
Every cladding with approval and conformity declaration.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
EI ratings for claddings — parallel to DIN, EU-recognised.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Metelen.
Decades — as long as the component stands, until mechanical damage. Inspection every 5 years recommended.
Survey in Metelen → board order → install. Documentation audit-ready.