Fire-protective claddings in Merzenich

Merzenich has steel halls, ventilation runs and load-bearing structures that must keep their function under fire. We install, renovate, document audit-ready.

Request survey+49 2861 8114387
Promatect · Knauf · HiltiSurvey in MerzenichFixed offer
Merzenich

What fire cladding does.

System selection in Merzenich depends on the bauteil and the visibility. Conservation-grade structures often get spray-applied systems — they meet F-rating without altering geometry. service shafts use Promatect plates for cost and speed.

Cladding types for Merzenich.

What we install in Merzenich depends on the structure, appearance and construction phase.

  1. 01

    Timber beam protection

    F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Merzenich.

  2. 02

    Fire-protective coating

    Intumescent coating — for visible steelwork, where boards would interfere visually.

  3. 03

    Sprayed plaster

    Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary. Audit-ready in Merzenich.

  4. 04

    Steel beam F30/F90

    Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.

  5. 05

    Duct cladding

    Promatect-L or equivalent — fully enclosing the duct, per approval, in Merzenich industrial settings.

  6. 06

    Shaft cladding

    Lift shafts or service shafts — F90 outside, F30 inside, per concept in Merzenich.

Where we cladding in Merzenich.

Lift shaft
F90 shaft wall with cladding — for stock renovation, top-up storeys, new build in Merzenich.
Duct lines
Ventilation ducts in school, care, office buildings in Merzenich — F90 cladding all-round. Standard scope in Merzenich.
Timber ceiling
Stock cladding for timber-beam ceilings — F30/F60 underside in Merzenich stock. Standard scope in Merzenich.
Stairwell structure
Steel staircases with F30 cladding — in stock, new build, as renovation measure. Standard scope in Merzenich.
Hall load-bearing
Steel beams in logistics and production halls in Merzenich — F30 to F90 per concept, audit-ready. Standard scope in Merzenich.
Service shaft
Heating, sewage, ventilation shaft — F90 cladding with inspection openings.

Standards.

  • MLAR
    Cable line directive

    Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.

  • DIN 4102-4
    Components under fire

    F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.

  • abZ
    Building-authority approval

    Every cladding with approval and conformity declaration.

  • EN 13501-2
    EU classification

    EI ratings for claddings — parallel to DIN, EU-recognised.

What fire claddings cost in Merzenich.

Heavily dependent on component and area — fixed price after survey.

  • from €60/m
    Steel beam F30 board claddingPer linear metre, three-sided
  • €120 – €250/m²
    Duct cladding F90All-round, in line
  • from €80/m²
    Shaft wall F90Lift shaft / service
  • Fixed price
    Timber-beam upgradeLump-sum after walkthrough in Merzenich
  • On request
    Fire-protective coatingPer m² visible area, intumescent

Fixed offer after survey in Merzenich.

Claddings in Merzenich — FAQ.

  • Decades — as long as the component stands, until mechanical damage. Inspection every 5 years recommended.

Plan claddings for Merzenich.

Survey in Merzenich → board order → install. Documentation audit-ready.

Call+49 2861 8114387