Fire-stop penetration seals in Kürten

Cable and pipe penetrations for walls and ceilings in Kürten — approved, tested, documented. Promat, Hilti, Würth · S30 to S90 · existing stock, new build, retrofit.

Promat · Hilti · WürthExisting & newAudit-ready documentation
Kürten

What a penetration seal achieves.

Every wall penetration in Kürten that crosses a fire-compartment boundary needs documentation: date. Consultants check this every year. Insurers reference it after a loss. A missing seal is the kind of finding that gets cited in damage reports.

Penetration systems for Kürten.

We combine Promat, Hilti and Würth — system-open, brand-neutral in Kürten.

  1. 01

    Stock documentation

    Take over multi-brand stock in Kürten, consolidate in the penetration plan, prepare for consultant sign-off. Documented in the property log in Kürten.

  2. 02

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Audit-ready in Kürten.

  3. 03

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line. Specified per approval in Kürten.

  4. 04

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Specified per approval in Kürten.

  5. 05

    Cable seal in wall

    Classic in Kürten stock: cables through F30/F90 wall, mineral wool with coating or board with collars.

  6. 06

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan. Documented in the property log in Kürten.

Where we install seals in Kürten.

Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Kürten.
Cable trays
Tray penetrations with box seals or aggregate seals. Standard scope in Kürten.
Stock survey
Take over multi-brand stock in Kürten, inspect, transfer into penetration plan, prepare for authorities.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Kürten.
Duct lines
Fire dampers, duct seals — schools, care, offices in Kürten. Standard scope in Kürten.

Standards.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Kürten buildings.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Kürten.

What penetration seals cost in Kürten.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Kürten

Fixed offer after walkthrough in Kürten.

Fire stops in Kürten — FAQ.

  • At least annually as part of maintenance — and after every cable/pipe change. Maintenance log mandatory in Kürten.

Have your seals checked for Kürten.

Call us — we take over the seal stock in Kürten and continue it.

Call+49 2861 8114387