Fire-protective claddings in Goch

Load-bearing structures keep their fire-resistance rating through approved board claddings, fire-protective coatings or mineral-wool build-ups — installed in Goch and Region Reg.-Bez. Düsseldorf.

Existing & newBrand-openOn site weekdays
Goch

What fire cladding does.

Fire claddings are board constructions that protect steel beams from heating for 30 to 120 minutes. The cladding turns an combustible timber into an F30/F90-compliant component.

Cladding types for Goch.

What we install in Goch depends on the structure, appearance and construction phase.

  1. 01

    Duct cladding

    Promatect-L or equivalent — fully enclosing the duct, per approval, in Goch industrial settings.

  2. 02

    Fire-protective coating

    Intumescent coating — for visible steelwork, where boards would interfere visually.

  3. 03

    Timber beam protection

    F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Goch.

  4. 04

    Sprayed plaster

    Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary. Specified per approval in Goch.

  5. 05

    Shaft cladding

    Lift shafts or service shafts — F90 outside, F30 inside, per concept in Goch.

  6. 06

    Steel beam F30/F90

    Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.

Where we cladding in Goch.

Duct lines
Ventilation ducts in school, care, office buildings in Goch — F90 cladding all-round.
Stairwell structure
Steel staircases with F30 cladding — in stock, new build, as renovation measure.
Hall load-bearing
Steel beams in logistics and production halls in Goch — F30 to F90 per concept, audit-ready. Standard scope in Goch.
Timber ceiling
Stock cladding for timber-beam ceilings — F30/F60 underside in Goch stock.
Service shaft
Heating, sewage, ventilation shaft — F90 cladding with inspection openings. Standard scope in Goch.
Lift shaft
F90 shaft wall with cladding — for stock renovation, top-up storeys, new build in Goch. Standard scope in Goch.

Standards.

  • EN 13501-2
    EU classification

    EI ratings for claddings — parallel to DIN, EU-recognised.

  • abZ
    Building-authority approval

    Every cladding with approval and conformity declaration.

  • MLAR
    Cable line directive

    Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.

  • DIN 4102-4
    Components under fire

    F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.

What fire claddings cost in Goch.

Heavily dependent on component and area — fixed price after survey.

  • from €60/m
    Steel beam F30 board claddingPer linear metre, three-sided
  • €120 – €250/m²
    Duct cladding F90All-round, in line
  • from €80/m²
    Shaft wall F90Lift shaft / service
  • Fixed price
    Timber-beam upgradeLump-sum after walkthrough in Goch
  • On request
    Fire-protective coatingPer m² visible area, intumescent

Fixed offer after survey in Goch.

Claddings in Goch — FAQ.

  • Decades — as long as the component stands, until mechanical damage. Inspection every 5 years recommended.

Plan claddings for Goch.

Survey in Goch → board order → install. Documentation audit-ready.