Every cladding with approval and conformity declaration.
Documentation is mandatory. Every cladding position needs system reference. We deliver this with the work — so the Bedburg-Hau consultant can sign off without re-opening cladding.
Load-bearing structures keep their fire-resistance rating through approved board claddings, fire-protective coatings or mineral-wool build-ups — installed in Bedburg-Hau and Region Reg.-Bez. Düsseldorf.

Documentation is mandatory. Every cladding position needs system reference. We deliver this with the work — so the Bedburg-Hau consultant can sign off without re-opening cladding.
What we install in Bedburg-Hau depends on the structure, appearance and construction phase.
Intumescent coating — for visible steelwork, where boards would interfere visually. Audit-ready in Bedburg-Hau.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Bedburg-Hau industrial settings. Specified per approval in Bedburg-Hau.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Bedburg-Hau. Audit-ready in Bedburg-Hau.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Specified per approval in Bedburg-Hau.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Bedburg-Hau.
Every cladding with approval and conformity declaration.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
EI ratings for claddings — parallel to DIN, EU-recognised.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Bedburg-Hau.
Depends on F-rating, appearance and visibility. Boards for hidden, coating for visible work.
Survey in Bedburg-Hau → board order → install. Documentation audit-ready.