EI ratings for claddings — parallel to DIN, EU-recognised.
Fire claddings are mineral-wool systems that protect steel beams from failure for 30 to 120 minutes. The cladding turns an unprotected steel beam into an building-authority-approved bauteil.
Augustdorf has steel halls, ventilation runs and load-bearing structures that must keep their function under fire. We install, renovate, document audit-ready.

Fire claddings are mineral-wool systems that protect steel beams from failure for 30 to 120 minutes. The cladding turns an unprotected steel beam into an building-authority-approved bauteil.
What we install in Augustdorf depends on the structure, appearance and construction phase.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Augustdorf. Documented in the property log in Augustdorf.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.
Intumescent coating — for visible steelwork, where boards would interfere visually.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Augustdorf industrial settings. Audit-ready in Augustdorf.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Augustdorf.
EI ratings for claddings — parallel to DIN, EU-recognised.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Every cladding with approval and conformity declaration.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Augustdorf.
Yes — F30/F90 retrofit-able, cladding around existing components, in occupied rooms in Augustdorf.
Survey in Augustdorf → board order → install. Documentation audit-ready.