SHEV systems in new builds

We accompany your project from early design through to handover. Sizing calculation, tender text, supply, installation and instruction — code-compliant in accordance with the applicable proofs of usability, with full documentation for handover and subsequent operation.

Request quote
Sizing in accordance with the applicable proofs of usabilityNSHEV · PSHEV · stairwellHandover protocol included
SHEV systems in new builds

How a new-build SHEV project runs.

In a new build, the economics of a SHEV are decided early — often before the roof structure stands. The earlier we are involved in planning, the better opening areas, device position, control cable routing and supply-air following can be coordinated with the building structure, roof drainage and building services. We work along the HOAI service phases: phases 2 / 3 bring advice and sizing calculation, phase 5 detailed planning, phase 6 tender text and bill of quantities, phase 8 supply, installation, commissioning and handover. Sizing basis is applicable proof of usability (natural) or -5 (powered) with object-specific geometry and assumed fire load. The result is the required aerodynamic effective area, from which number, size and layout of the NSHEV follow. For PSHEV we calculate the required volumetric flow, the air ducting and the fan temperature class. Handover takes place together with the fire safety expert or the inspection expert under PrüfVO NRW — with functional evidence of all components.

What we deliver on a new build.

Which variant fits depends on the installation context, the existing building and the fire-protection concept — we advise per project.

Sizing calculation

Aerodynamic effective area, volumetric flow, supply-air concept — as evidence for building approval.

from €4,500

Execution drawings

Positioning, cable routes, control panel, detector and manual call point planning.

from €18,000

Tender text

Bill of quantities per VOB/C or as functional tender.

from €45,000

Device supply

CE- and applicable proof of usability-compliant, with Declaration of Performance and approval evidence.

from €80,000

Installation & wiring

Installation by certified fitters, incl. control cables and panel.

Handover & instruction

Functional test, protocol, operator briefing, documentation.

Prices are indicative without planning fees and VAT. Binding after sizing calculation and detailed planning.

Where we plan and install.

We cover every typical building type — from residential to industrial complexes with hundreds of components per site.

01

Logistics halls

Rooflight-band NSHEV across the hall length, coordinated with high-bay racking and fire compartments.

02

Production buildings

NSHEV plus powered extraction in fire-load-intensive areas.

03

Office and administrative buildings

Stairwell SHEV, atrium extraction, possibly pressurised smoke protection.

04

Retail and assembly venues

Ceiling outlet, supply air via facade, smoke curtains for containment.

05

Underground garages

Powered CO ventilation plus extraction per Garage Ordinance.

06

Schools and kindergartens

Stairwell extraction, SHEV via rooflight dome, smoke detectors with FDA linkage.

  • applicable proof of usability

    Sizing basis

    Natural smoke exhaust — calculation, verification, layout.

  • applicable proof of usability

    Powered sizing

    PSHEV — volumetric flow, air ducting, fans.

  • applicable proof of usability / -3 / -6

    Product standards

    Minimum requirements for NSHEV, fans, pressurisation.

  • VOB/C applicable proof of usability

    Tendering

    Performance description for insulation and fire protection works.

  • IndBauR · VStättVO · VkVO NRW

    Mandatory triggers

    When and where a SHEV is legally required.

Six phases to a handed-over system.

Each phase with clear milestones — no schedule surprises and no cost blocks in change orders.

Planning and execution

Sizing, installation, handover — no interface between planner and contractor.

HOAI-compatible

We plug into HOAI service phases 2 to 8 — clean invoicing, clean documentation.

Manufacturer-independent

We select the system that fits technically — not the one that maximises our margin.

Handover support

With an inspection expert under PrüfVO NRW — up to signature on the handover protocol.

  1. 01

    1 — Feasibility

    Site inspection, occupancy, fire protection concept, initial feasibility.

  2. 02

    2 — Sizing

    Calculation in accordance with the applicable proofs of usability with device proposal and variant comparison.

  3. 03

    3 — Detailed planning

    Layout plans, cable routes, interfaces to facade, roof, electrical.

  4. 04

    4 — Delivery

    Just-in-time to site, interim storage by arrangement.

  5. 05

    5 — Installation

    Assembly, wiring, commissioning — coordinated with construction progress.

  6. 06

    6 — Handover

    Inspection with expert, operator briefing, handover of documentation.

SHEV in a new build — in brief.

Enquire about a new-build SHEV.

Send us plans, occupancy description and fire protection concept (or draft). We respond within one business day with an initial assessment and a price frame.