Fire-rated gate installation

A fire-rated gate only protects compliantly when professionally installed. The DIBt approval is valid only when fitted per manufacturer specifications by a trained specialist contractor. We install gates from all common manufacturers — coordinated with your construction sequence, documented and ready for handover.

Submit a project enquiry
Manufacturer-certifiedSurvey to handover from a single sourceBrand-agnostic — all common systems
Fire-rated gate installation

Approval is valid only with correct installation.

The national building approval (abZ) of a fire-rated gate is tied to professional installation by a trained specialist contractor. Installation errors — wrong anchoring, deviating gap dimensions, unsuitable connection details — invalidate the approval. In a damage event that means: no fire protection, no insurance pay-out, personal liability. We install per manufacturer specifications, document each step with photos and hand over the conformity declaration, installation and commissioning records for a handover-ready result.

Variants

Which variant fits depends on the installation context, the existing building and the fire-protection concept — we advise per project.

Standard configuration

Cost-efficient solution for the most common installation contexts — tested systems from established manufacturers.

On request

Bespoke configuration

For non-standard sizes, installation contexts or higher requirements driven by the fire-protection concept or expert reports.

Existing buildings & retrofit

Recertification of existing components or phased replacement — coordinated around live operations.

All prices excl. VAT. Maintenance contracts are quoted on a per-unit basis.

Where we work

We cover every typical building type — from residential to industrial complexes with hundreds of components per site.

01

Residential

Apartment buildings, stairwells, transitions to boiler rooms and underground garages — usually with smoke-protection properties.

02

Industry & logistics

Separation of production, storage and administration plus protection of mechanically loaded plant.

03

Public buildings

Schools, hospitals and administrative buildings under NRW special-buildings regulations — often combined with hold-open systems.

  • DIN 4102

    Fire behaviour of building materials

    German baseline standard for classifying building components under fire exposure.

  • DIN EN 1634-1

    European classification

    Test method and classification under EN 13501-2 — basis for CE marking.

  • DIN 31051

    Maintenance

    Basis for annual maintenance duties and audit-ready inspection records.

  • BauO NRW + SBauVO

    NRW state law

    NRW Building Code and special-buildings regulation — binding for all special-purpose buildings.

Seven steps from first contact to handover.

Structured, plannable, documented — you know what happens next at every stage.

Manufacturer qualification

Manufacturer-trained — with current training records.

Experience across all sizes

From single personnel doors to 8-metre sliding installations — we know the requirements.

On-time delivery

We hold to binding dates — important for your construction sequence and commissioning.

Optional follow-on maintenance

After installation we can take over annual maintenance — one contact for the entire life cycle.

  1. 01

    1 — Consultation & planning

    Which gate for which situation — aligned with fire protection concept and construction sequence.

  2. 02

    2 — On-site survey

    Opening dimensions, structure, available space, connection options.

  3. 03

    3 — Structural assessment

    Load capacity, wall quality, lintel, fixing — clarified before order placement.

  4. 04

    4 — Quotation

    Detailed schedule of services with clear line items and lump-sum prices.

  5. 05

    5 — Delivery

    Gates delivered in line with construction progress — neither too early nor too late.

  6. 06

    6 — Installation

    Fitting by a manufacturer-certified team with photo documentation of each step.

  7. 07

    7 — Commissioning & handover

    Function test, instruction, conformity declaration, log book entry.

Installation — explained.

Submit a project.

Send us drawings, dimensions or photos of the opening — we respond within 24 hours with an assessment or a survey appointment.

Call+49 2861 8114387