Fire-rated gate installation

A fire-rated gate only protects compliantly when professionally installed. The DIBt approval is valid only when fitted per manufacturer specifications by a trained specialist contractor. We install gates from all common manufacturers — coordinated with your construction sequence, documented and ready for handover.

Manufacturer-certifiedSurvey to handover from a single sourceHörmann · Novoferm · Teckentrup · Stöbich
Installation of a fire-rated sectional gate
↳ Certified install
Installation of an F90 sliding gate · Industrial hall NRW
↳ Why professional

Approval is valid only with correct installation.

The national building approval (abZ) of a fire-rated gate is tied to professional installation by a trained specialist contractor. Installation errors — wrong anchoring, deviating gap dimensions, unsuitable connection details — invalidate the approval. In a damage event that means: no fire protection, no insurance pay-out, personal liability. We install per manufacturer specifications, document each step with photos and hand over the conformity declaration, installation and commissioning records for a handover-ready result.

↳ Our process

Seven steps from first contact to handover.

Structured, plannable, documented — you know what happens next at every stage.

  1. ↳ 01

    1 — Consultation & planning

    Which gate for which situation — aligned with fire protection concept and construction sequence.

  2. ↳ 02

    2 — On-site survey

    Opening dimensions, structure, available space, connection options.

  3. ↳ 03

    3 — Structural assessment

    Load capacity, wall quality, lintel, fixing — clarified before order placement.

  4. ↳ 04

    4 — Quotation

    Detailed schedule of services with clear line items and lump-sum prices.

  5. ↳ 05

    5 — Delivery

    Gates delivered in line with construction progress — neither too early nor too late.

  6. ↳ 06

    6 — Installation

    Fitting by a manufacturer-certified team with photo documentation of each step.

  7. ↳ 07

    7 — Commissioning & handover

    Function test, instruction, conformity declaration, log book entry.

↳ Why Abels

Experience, qualification, on-time delivery.

01 / 4

Manufacturer qualification

Trained at Hörmann, Novoferm, Teckentrup and Stöbich — with current training records.

02 / 4

Experience across all sizes

From single personnel doors to 8-metre sliding installations — we know the requirements.

03 / 4

On-time delivery

We hold to binding dates — important for your construction sequence and commissioning.

04 / 4

Optional follow-on maintenance

After installation we can take over annual maintenance — one contact for the entire life cycle.

↳ Frequent questions

Installation — explained.

↳ See also

Related services.

↳ Next step

Submit a project.

Send us drawings, dimensions or photos of the opening — we respond within 24 hours with an assessment or a survey appointment.