Cable penetration — wall

Wall penetrations for cable trays — compliant with applicable proof of usability. Typical EI90 / S90 in solid walls, F90-A tested.

Request a quote
applicable proof of usability testedEI30 to EI120New build & retrofit
Cable penetration — wall

Cable penetration — wall — definition & use.

Wall cable firestops separate compartments in solid walls (masonry, concrete) or light partitions (F90-A plasterboard). Execution with soft seal, firestop mortar, pillows or combined systems depending on opening size. EI90 in accordance with the applicable proofs of usability corresponds to S90 in accordance with the applicable proofs of usability.

Variants

Which variant fits depends on the installation context, the existing building and the fire-protection concept — we advise per project.

Standard configuration

Cost-efficient solution for the most common installation contexts — tested systems from established manufacturers.

On request

Bespoke configuration

For non-standard sizes, installation contexts or higher requirements driven by the fire-protection concept or expert reports.

Existing buildings & retrofit

Recertification of existing components or phased replacement — coordinated around live operations.

All prices excl. VAT. Maintenance contracts are quoted on a per-unit basis.

Where we work

We cover every typical building type — from residential to industrial complexes with hundreds of components per site.

01

Residential

Apartment buildings, stairwells, transitions to boiler rooms and underground garages — usually with smoke-protection properties.

02

Industry & logistics

Separation of production, storage and administration plus protection of mechanically loaded plant.

03

Public buildings

Schools, hospitals and administrative buildings under NRW special-buildings regulations — often combined with hold-open systems.

  • applicable proof of usability

    Test method penetration seals

    European test standard for cable, pipe and combined penetrations.

  • applicable proof of usability

    National classification

    German classification S90 / S120 for cable penetrations.

  • MLAR

    Model installation guideline

    Binding rules for routing services through fire-rated elements.

  • applicable proof of usability

    Planning & execution

    Fundamentals for active and passive fire protection design.

What we deliver.

NRW-wide, exclusively with our own installers — no subcontractors.

NRW-wide

Aachen to Bielefeld, Lower Rhine to Sauerland — survey usually within five working days.

Our own installers

No subcontractors. Warranty work and maintenance always trace back to the same people.

Maintenance contracts

We schedule appointments proactively. Inspection record for the fire authority comes with every visit.

  1. 01

    Survey & cataloguing

    Walk-through, photo documentation, penetration register — the basis for quotation and pass.

  2. 02

    New firestop

    Installation of certified systems with penetration pass and building-book entry.

  3. 03

    Upgrade & retrofit

    Refurbishment of open or faulty penetrations in existing buildings — with approved system change.

  4. 04

    Annual service

    Walk-through, visual check, documentation updates for insurers and inspectors.

Cable penetration — wall in detail.

Cable penetration — wall — request a quote.

We document the existing state, plan the retrofit and hand over a complete penetration pass.

Call+49 2861 8114387