Every cladding with approval and conformity declaration.
Fire claddings are coated build-ups that protect timber elements from heating for 30 to 120 minutes. The cladding turns an unprotected steel beam into an F30/F90-compliant component.
Cladding steelwork, lining ventilation ducts, retrofitting load-bearing structures in Werther. Boards, coatings, mineral-wool systems.

Fire claddings are coated build-ups that protect timber elements from heating for 30 to 120 minutes. The cladding turns an unprotected steel beam into an F30/F90-compliant component.
What we install in Werther depends on the structure, appearance and construction phase.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Werther. Audit-ready in Werther.
Intumescent coating — for visible steelwork, where boards would interfere visually. Audit-ready in Werther.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary. Specified per approval in Werther.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Werther.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Werther industrial settings. Audit-ready in Werther.
Every cladding with approval and conformity declaration.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
EI ratings for claddings — parallel to DIN, EU-recognised.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Werther.
Depends on F-rating, appearance and visibility. Boards for hidden, coating for visible work.
Survey in Werther → board order → install. Documentation audit-ready.