EI ratings for claddings — parallel to DIN, EU-recognised.
Fire claddings are board constructions that protect timber elements from load loss for 30 to 120 minutes. The cladding turns an bare duct into an F30/F90-compliant component.
Cladding steelwork, lining ventilation ducts, retrofitting load-bearing structures in Warendorf. Boards, coatings, mineral-wool systems.

Fire claddings are board constructions that protect timber elements from load loss for 30 to 120 minutes. The cladding turns an bare duct into an F30/F90-compliant component.
What we install in Warendorf depends on the structure, appearance and construction phase.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Warendorf. Audit-ready in Warendorf.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary. Documented in the property log in Warendorf.
Intumescent coating — for visible steelwork, where boards would interfere visually. Audit-ready in Warendorf.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Warendorf.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Warendorf industrial settings.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Specified per approval in Warendorf.
EI ratings for claddings — parallel to DIN, EU-recognised.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Every cladding with approval and conformity declaration.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Warendorf.
Yes — F30/F90 retrofit-able, cladding around existing components, in occupied rooms in Warendorf.
Survey in Warendorf → board order → install. Documentation audit-ready.