Mandates ongoing functionality of fire-protection elements — applies in NRW.
What gets checked at each visit in Stemwede: damper — release test, motor, end-switch. Anything outside spec goes on the cost-to-fix sheet you receive within the same week.
Annual maintenance of all fire-protection elements in Stemwede: doors, gates, fire stops, dampers — with maintenance log, defect report, audit-ready documentation.

What gets checked at each visit in Stemwede: damper — release test, motor, end-switch. Anything outside spec goes on the cost-to-fix sheet you receive within the same week.
What we offer for Stemwede properties.
One-off first walkthrough in Stemwede stock — penetration plan, door list, maintenance log.
Once per year, standard scope — doors + gates + seals + defect report for Stemwede. Audit-ready in Stemwede.
Before consultant sign-off — fix defects, complete documentation, run pre-inspection.
Twice per year — for critical properties, in industry, when insurance demands it in Stemwede.
Acute slots in Stemwede — door defective, seal opened, gate stuck. Response within 24 h.
Door and gate maintenance in one contract — coordinated dates, fixed price, joint audit-ready documentation.
Mandates ongoing functionality of fire-protection elements — applies in NRW.
Insurers in Stemwede typically demand annual maintenance proof.
Mandatory contents of maintenance — closing test, warp, hardware — in Stemwede.
General framework for maintenance, inspection, repair.
Per-position price or fixed price per property.
Fixed offer after walkthrough in Stemwede.
Yes — Schörghuber, Hörmann, Teckentrup, Promat, Hilti, Würth, third-party — we maintain brand-open in Stemwede.
Walkthrough in Stemwede → stock survey → fixed offer → maintenance running. Three weeks from call to documentation.