Fire-stop penetration seals in Sendenhorst

Cable and pipe penetrations for walls and ceilings in Sendenhorst — approved, tested, documented. Promat, Hilti, Würth · S30 to S90 · existing stock, new build, retrofit.

Request walkthrough+49 2861 8114387
Promat · Hilti · WürthExisting & newAudit-ready documentation
Sendenhorst

What a penetration seal achieves.

An F90-rated wall in Sendenhorst loses its function the moment a cable, pipe or duct passes through it unsealed. Only the tested penetration seal restores that fire resistance — and only if the system used matches the wall construction.

Penetration systems for Sendenhorst.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Cable seal in wall

    Classic in Sendenhorst stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Audit-ready in Sendenhorst.

  2. 02

    Stock documentation

    Take over multi-brand stock in Sendenhorst, consolidate in the penetration plan, prepare for consultant sign-off.

  3. 03

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line. Documented in the property log in Sendenhorst.

  4. 04

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables.

  5. 05

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Audit-ready in Sendenhorst.

  6. 06

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan. Audit-ready in Sendenhorst.

Where we install seals in Sendenhorst.

Stock survey
Take over multi-brand stock in Sendenhorst, inspect, transfer into penetration plan, prepare for authorities. Standard scope in Sendenhorst.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.
Cable trays
Tray penetrations with box seals or aggregate seals. Standard scope in Sendenhorst.
Duct lines
Fire dampers, duct seals — schools, care, offices in Sendenhorst.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Sendenhorst. Standard scope in Sendenhorst.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Sendenhorst.

Standards.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Sendenhorst buildings.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Sendenhorst.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

What penetration seals cost in Sendenhorst.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Sendenhorst

Fixed offer after walkthrough in Sendenhorst.

Fire stops in Sendenhorst — FAQ.

  • Yes — open seal, add cable, reseal. Standard service in Sendenhorst.

Have your seals checked for Sendenhorst.

Walkthrough in Sendenhorst → defect list → fixed offer.

Call+49 2861 8114387