Fire-stop penetration seals in Schleiden

Schleiden needs penetration seals that hold the fire-compartment boundary, pass the inspection, get signed off.

Wall · ceilingS30 · S60 · S90With penetration plan
Schleiden

What a penetration seal achieves.

The right system depends on context. Mineral wool with coating handle most wall penetrations in Schleiden stock; mortar systems go in for larger openings. Combined cable+pipe penetrations need a system that's approved for both.

Penetration systems for Schleiden.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Documented in the property log in Schleiden.

  2. 02

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution.

  3. 03

    Cable seal in wall

    Classic in Schleiden stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Documented in the property log in Schleiden.

  4. 04

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line. Documented in the property log in Schleiden.

  5. 05

    Stock documentation

    Take over multi-brand stock in Schleiden, consolidate in the penetration plan, prepare for consultant sign-off.

  6. 06

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan. Specified per approval in Schleiden.

Where we install seals in Schleiden.

Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Schleiden. Standard scope in Schleiden.
Cable trays
Tray penetrations with box seals or aggregate seals. Standard scope in Schleiden.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Schleiden.
Stock survey
Take over multi-brand stock in Schleiden, inspect, transfer into penetration plan, prepare for authorities.
Duct lines
Fire dampers, duct seals — schools, care, offices in Schleiden.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus. Standard scope in Schleiden.

Standards.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Schleiden buildings.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Schleiden.

What penetration seals cost in Schleiden.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Schleiden

Fixed offer after walkthrough in Schleiden.

Fire stops in Schleiden — FAQ.

  • Yes — as long as each position has an approval and the documentation is consistent. We take over stock brand-neutrally.

Have your seals checked for Schleiden.

Call us — we take over the seal stock in Schleiden and continue it.

Call+49 2861 8114387