Fire-protective claddings in Reichshof

Cladding steelwork, lining ventilation ducts, retrofitting load-bearing structures in Reichshof. Boards, coatings, mineral-wool systems.

Request survey+49 2861 8114387
Existing & newBrand-openOn site weekdays
Reichshof

What fire cladding does.

Fire claddings are mineral-wool systems that protect steel beams from load loss for 30 to 120 minutes. The cladding turns an combustible timber into an properly rated structural element.

Cladding types for Reichshof.

What we install in Reichshof depends on the structure, appearance and construction phase.

  1. 01

    Duct cladding

    Promatect-L or equivalent — fully enclosing the duct, per approval, in Reichshof industrial settings.

  2. 02

    Sprayed plaster

    Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.

  3. 03

    Shaft cladding

    Lift shafts or service shafts — F90 outside, F30 inside, per concept in Reichshof. Specified per approval in Reichshof.

  4. 04

    Timber beam protection

    F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Reichshof.

  5. 05

    Steel beam F30/F90

    Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Documented in the property log in Reichshof.

  6. 06

    Fire-protective coating

    Intumescent coating — for visible steelwork, where boards would interfere visually. Documented in the property log in Reichshof.

Where we cladding in Reichshof.

Lift shaft
F90 shaft wall with cladding — for stock renovation, top-up storeys, new build in Reichshof. Standard scope in Reichshof.
Duct lines
Ventilation ducts in school, care, office buildings in Reichshof — F90 cladding all-round. Standard scope in Reichshof.
Service shaft
Heating, sewage, ventilation shaft — F90 cladding with inspection openings. Standard scope in Reichshof.
Hall load-bearing
Steel beams in logistics and production halls in Reichshof — F30 to F90 per concept, audit-ready.
Timber ceiling
Stock cladding for timber-beam ceilings — F30/F60 underside in Reichshof stock. Standard scope in Reichshof.
Stairwell structure
Steel staircases with F30 cladding — in stock, new build, as renovation measure. Standard scope in Reichshof.

Standards.

  • MLAR
    Cable line directive

    Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.

  • DIN 4102-4
    Components under fire

    F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.

  • abZ
    Building-authority approval

    Every cladding with approval and conformity declaration.

  • EN 13501-2
    EU classification

    EI ratings for claddings — parallel to DIN, EU-recognised.

What fire claddings cost in Reichshof.

Heavily dependent on component and area — fixed price after survey.

  • from €60/m
    Steel beam F30 board claddingPer linear metre, three-sided
  • €120 – €250/m²
    Duct cladding F90All-round, in line
  • from €80/m²
    Shaft wall F90Lift shaft / service
  • Fixed price
    Timber-beam upgradeLump-sum after walkthrough in Reichshof
  • On request
    Fire-protective coatingPer m² visible area, intumescent

Fixed offer after survey in Reichshof.

Claddings in Reichshof — FAQ.

  • For special-use buildings, in maintenance plans, at renovation completion — yes. Documentation in Reichshof provided.

Plan claddings for Reichshof.

Survey in Reichshof → board order → install. Documentation audit-ready.

Call+49 2861 8114387