Fire-stop penetration seals in Reichshof

Reichshof needs penetration seals that hold the fire-compartment boundary, pass the inspection, get signed off.

Promat · Hilti · WürthExisting & newAudit-ready documentation
Reichshof

What a penetration seal achieves.

Every wall penetration in Reichshof that crosses a fire-compartment boundary needs documentation: date. Consultants check this every year. Insurers reference it after a loss. A missing seal is the kind of finding that raises premiums.

Penetration systems for Reichshof.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Specified per approval in Reichshof.

  2. 02

    Stock documentation

    Take over multi-brand stock in Reichshof, consolidate in the penetration plan, prepare for consultant sign-off.

  3. 03

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Audit-ready in Reichshof.

  4. 04

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  5. 05

    Cable seal in wall

    Classic in Reichshof stock: cables through F30/F90 wall, mineral wool with coating or board with collars.

  6. 06

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

Where we install seals in Reichshof.

Duct lines
Fire dampers, duct seals — schools, care, offices in Reichshof.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Reichshof.
Stock survey
Take over multi-brand stock in Reichshof, inspect, transfer into penetration plan, prepare for authorities.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Reichshof. Standard scope in Reichshof.
Cable trays
Tray penetrations with box seals or aggregate seals.

Standards.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Reichshof.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Reichshof buildings.

What penetration seals cost in Reichshof.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Reichshof

Fixed offer after walkthrough in Reichshof.

Fire stops in Reichshof — FAQ.

  • Yes — as long as each position has an approval and the documentation is consistent. We take over stock brand-neutrally.

Have your seals checked for Reichshof.

Call us — we take over the seal stock in Reichshof and continue it.

Call+49 2861 8114387