EI ratings for claddings — parallel to DIN, EU-recognised.
Fire claddings are mineral-wool systems that protect load-bearing components from load loss for 30 to 120 minutes. The cladding turns an bare duct into an properly rated structural element.
Load-bearing structures keep their fire-resistance rating through approved board claddings, fire-protective coatings or mineral-wool build-ups — installed in Medebach and Region Reg.-Bez. Arnsberg.

Fire claddings are mineral-wool systems that protect load-bearing components from load loss for 30 to 120 minutes. The cladding turns an bare duct into an properly rated structural element.
What we install in Medebach depends on the structure, appearance and construction phase.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Medebach. Documented in the property log in Medebach.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Medebach industrial settings. Documented in the property log in Medebach.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Audit-ready in Medebach.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Medebach.
Intumescent coating — for visible steelwork, where boards would interfere visually.
EI ratings for claddings — parallel to DIN, EU-recognised.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Every cladding with approval and conformity declaration.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Medebach.
For special-use buildings, in maintenance plans, at renovation completion — yes. Documentation in Medebach provided.
Survey in Medebach → board order → install. Documentation audit-ready.