What a penetration seal achieves.

Penetration seals are approved closures of wall and ceiling openings. They hold the rated wall's integrity for the same duration the wall itself is rated for — 30, 60 or 90 minutes. Without a seal, every cable, pipe or duct that crosses the wall becomes a direct path for flames and smoke.

Penetration systems for Holzwickede.

We combine Promat, Hilti and Würth — system-open, brand-neutral in Holzwickede.

  1. 01

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan. Specified per approval in Holzwickede.

  2. 02

    Cable seal in wall

    Classic in Holzwickede stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Specified per approval in Holzwickede.

  3. 03

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line. Audit-ready in Holzwickede.

  4. 04

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Specified per approval in Holzwickede.

  5. 05

    Stock documentation

    Take over multi-brand stock in Holzwickede, consolidate in the penetration plan, prepare for consultant sign-off. Audit-ready in Holzwickede.

  6. 06

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables. Specified per approval in Holzwickede.

Where we install seals in Holzwickede.

Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Holzwickede.
Duct lines
Fire dampers, duct seals — schools, care, offices in Holzwickede.
Stock survey
Take over multi-brand stock in Holzwickede, inspect, transfer into penetration plan, prepare for authorities. Standard scope in Holzwickede.
Cable trays
Tray penetrations with box seals or aggregate seals.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Holzwickede.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus. Standard scope in Holzwickede.

Standards.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Holzwickede buildings.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Holzwickede.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

What penetration seals cost in Holzwickede.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Holzwickede

Fixed offer after walkthrough in Holzwickede.

Fire stops in Holzwickede — FAQ.

  • Yes — as long as each position has an approval and the documentation is consistent. We take over stock brand-neutrally.

Have your seals checked for Holzwickede.

Call us — we take over the seal stock in Holzwickede and continue it.

Call+49 2861 8114387