EI ratings for claddings — parallel to DIN, EU-recognised.
Documentation is mandatory. Every cladding position needs installer signature. We deliver this with the work — so the Herne consultant can sign off without chasing missing data.
Cladding steelwork, lining ventilation ducts, retrofitting load-bearing structures in Herne. Boards, coatings, mineral-wool systems.

Documentation is mandatory. Every cladding position needs installer signature. We deliver this with the work — so the Herne consultant can sign off without chasing missing data.
What we install in Herne depends on the structure, appearance and construction phase.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary. Specified per approval in Herne.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Herne. Specified per approval in Herne.
Intumescent coating — for visible steelwork, where boards would interfere visually. Specified per approval in Herne.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Herne. Specified per approval in Herne.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Herne industrial settings.
EI ratings for claddings — parallel to DIN, EU-recognised.
Every cladding with approval and conformity declaration.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Herne.
Depends on F-rating, appearance and visibility. Boards for hidden, coating for visible work.
Survey in Herne → board order → install. Documentation audit-ready.