Every cladding with approval and conformity declaration.
Fire claddings are coated build-ups that protect steel beams from load loss for 30 to 120 minutes. The cladding turns an unprotected steel beam into an building-authority-approved bauteil.
Load-bearing structures keep their fire-resistance rating through approved board claddings, fire-protective coatings or mineral-wool build-ups — installed in Hagen and Region Reg.-Bez. Arnsberg.

Fire claddings are coated build-ups that protect steel beams from load loss for 30 to 120 minutes. The cladding turns an unprotected steel beam into an building-authority-approved bauteil.
What we install in Hagen depends on the structure, appearance and construction phase.
F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Hagen.
Intumescent coating — for visible steelwork, where boards would interfere visually. Audit-ready in Hagen.
Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam.
Lift shafts or service shafts — F90 outside, F30 inside, per concept in Hagen.
Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.
Promatect-L or equivalent — fully enclosing the duct, per approval, in Hagen industrial settings. Specified per approval in Hagen.
Every cladding with approval and conformity declaration.
EI ratings for claddings — parallel to DIN, EU-recognised.
F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.
Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.
Heavily dependent on component and area — fixed price after survey.
Fixed offer after survey in Hagen.
For special-use buildings, in maintenance plans, at renovation completion — yes. Documentation in Hagen provided.
Survey in Hagen → board order → install. Documentation audit-ready.