What fire cladding does.

Fire claddings are coated build-ups that protect load-bearing components from heating for 30 to 120 minutes. The cladding turns an bare duct into an properly rated structural element.

Cladding types for Erkelenz.

What we install in Erkelenz depends on the structure, appearance and construction phase.

  1. 01

    Fire-protective coating

    Intumescent coating — for visible steelwork, where boards would interfere visually. Audit-ready in Erkelenz.

  2. 02

    Sprayed plaster

    Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.

  3. 03

    Shaft cladding

    Lift shafts or service shafts — F90 outside, F30 inside, per concept in Erkelenz. Audit-ready in Erkelenz.

  4. 04

    Timber beam protection

    F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Erkelenz. Specified per approval in Erkelenz.

  5. 05

    Duct cladding

    Promatect-L or equivalent — fully enclosing the duct, per approval, in Erkelenz industrial settings.

  6. 06

    Steel beam F30/F90

    Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Audit-ready in Erkelenz.

Where we cladding in Erkelenz.

Lift shaft
F90 shaft wall with cladding — for stock renovation, top-up storeys, new build in Erkelenz. Standard scope in Erkelenz.
Timber ceiling
Stock cladding for timber-beam ceilings — F30/F60 underside in Erkelenz stock. Standard scope in Erkelenz.
Service shaft
Heating, sewage, ventilation shaft — F90 cladding with inspection openings. Standard scope in Erkelenz.
Stairwell structure
Steel staircases with F30 cladding — in stock, new build, as renovation measure.
Hall load-bearing
Steel beams in logistics and production halls in Erkelenz — F30 to F90 per concept, audit-ready.
Duct lines
Ventilation ducts in school, care, office buildings in Erkelenz — F90 cladding all-round. Standard scope in Erkelenz.

Standards.

  • DIN 4102-4
    Components under fire

    F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.

  • EN 13501-2
    EU classification

    EI ratings for claddings — parallel to DIN, EU-recognised.

  • MLAR
    Cable line directive

    Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.

  • abZ
    Building-authority approval

    Every cladding with approval and conformity declaration.

What fire claddings cost in Erkelenz.

Heavily dependent on component and area — fixed price after survey.

  • from €60/m
    Steel beam F30 board claddingPer linear metre, three-sided
  • €120 – €250/m²
    Duct cladding F90All-round, in line
  • from €80/m²
    Shaft wall F90Lift shaft / service
  • Fixed price
    Timber-beam upgradeLump-sum after walkthrough in Erkelenz
  • On request
    Fire-protective coatingPer m² visible area, intumescent

Fixed offer after survey in Erkelenz.

Claddings in Erkelenz — FAQ.

  • Decades — as long as the component stands, until mechanical damage. Inspection every 5 years recommended.

Plan claddings for Erkelenz.

Survey in Erkelenz → board order → install. Documentation audit-ready.

Call+49 2861 8114387