Fire-protective claddings in Büren

Fire claddings for steel beams, timber elements and ventilation ducts in Büren. F30, F90 and higher — approved Promatect, Knauf fire systems.

Request survey+49 2861 8114387
F30 · F90 · F120Steel · timber · ductsWith documentation
Büren

What fire cladding does.

Documentation is mandatory. Every cladding position needs approval number. We deliver this with the work — so the Büren consultant can sign off without chasing missing data.

Cladding types for Büren.

What we install in Büren depends on the structure, appearance and construction phase.

  1. 01

    Shaft cladding

    Lift shafts or service shafts — F90 outside, F30 inside, per concept in Büren.

  2. 02

    Steel beam F30/F90

    Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Documented in the property log in Büren.

  3. 03

    Sprayed plaster

    Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary. Audit-ready in Büren.

  4. 04

    Timber beam protection

    F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Büren.

  5. 05

    Fire-protective coating

    Intumescent coating — for visible steelwork, where boards would interfere visually. Audit-ready in Büren.

  6. 06

    Duct cladding

    Promatect-L or equivalent — fully enclosing the duct, per approval, in Büren industrial settings. Documented in the property log in Büren.

Where we cladding in Büren.

Stairwell structure
Steel staircases with F30 cladding — in stock, new build, as renovation measure. Standard scope in Büren.
Duct lines
Ventilation ducts in school, care, office buildings in Büren — F90 cladding all-round.
Timber ceiling
Stock cladding for timber-beam ceilings — F30/F60 underside in Büren stock.
Service shaft
Heating, sewage, ventilation shaft — F90 cladding with inspection openings.
Hall load-bearing
Steel beams in logistics and production halls in Büren — F30 to F90 per concept, audit-ready. Standard scope in Büren.
Lift shaft
F90 shaft wall with cladding — for stock renovation, top-up storeys, new build in Büren. Standard scope in Büren.

Standards.

  • MLAR
    Cable line directive

    Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.

  • abZ
    Building-authority approval

    Every cladding with approval and conformity declaration.

  • DIN 4102-4
    Components under fire

    F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.

  • EN 13501-2
    EU classification

    EI ratings for claddings — parallel to DIN, EU-recognised.

What fire claddings cost in Büren.

Heavily dependent on component and area — fixed price after survey.

  • from €60/m
    Steel beam F30 board claddingPer linear metre, three-sided
  • €120 – €250/m²
    Duct cladding F90All-round, in line
  • from €80/m²
    Shaft wall F90Lift shaft / service
  • Fixed price
    Timber-beam upgradeLump-sum after walkthrough in Büren
  • On request
    Fire-protective coatingPer m² visible area, intumescent

Fixed offer after survey in Büren.

Claddings in Büren — FAQ.

  • Depends on F-rating, appearance and visibility. Boards for hidden, coating for visible work.

Plan claddings for Büren.

Survey in Büren → board order → install. Documentation audit-ready.

Call+49 2861 8114387