Fire-protective claddings in Borgentreich

Cladding steelwork, lining ventilation ducts, retrofitting load-bearing structures in Borgentreich. Boards, coatings, mineral-wool systems.

Request survey+49 2861 8114387
Promatect · Knauf · HiltiSurvey in BorgentreichFixed offer
Borgentreich

What fire cladding does.

System selection in Borgentreich depends on the bauteil and the visibility. Architectural beams often get paint-grade finishes — they meet F-rating without altering geometry. service shafts use board cladding for cost and speed.

Cladding types for Borgentreich.

What we install in Borgentreich depends on the structure, appearance and construction phase.

  1. 01

    Shaft cladding

    Lift shafts or service shafts — F90 outside, F30 inside, per concept in Borgentreich. Audit-ready in Borgentreich.

  2. 02

    Timber beam protection

    F30/F60 cladding for existing ceilings — for top-ups, renovation, stock protection in Borgentreich. Documented in the property log in Borgentreich.

  3. 03

    Duct cladding

    Promatect-L or equivalent — fully enclosing the duct, per approval, in Borgentreich industrial settings. Documented in the property log in Borgentreich.

  4. 04

    Sprayed plaster

    Sprayable, for large-area load-bearing structures in industrial halls where appearance is secondary.

  5. 05

    Fire-protective coating

    Intumescent coating — for visible steelwork, where boards would interfere visually.

  6. 06

    Steel beam F30/F90

    Board cladding with Promatect or Knauf — three-sided or four-sided box around the beam. Documented in the property log in Borgentreich.

Where we cladding in Borgentreich.

Hall load-bearing
Steel beams in logistics and production halls in Borgentreich — F30 to F90 per concept, audit-ready. Standard scope in Borgentreich.
Service shaft
Heating, sewage, ventilation shaft — F90 cladding with inspection openings.
Lift shaft
F90 shaft wall with cladding — for stock renovation, top-up storeys, new build in Borgentreich.
Timber ceiling
Stock cladding for timber-beam ceilings — F30/F60 underside in Borgentreich stock.
Stairwell structure
Steel staircases with F30 cladding — in stock, new build, as renovation measure.
Duct lines
Ventilation ducts in school, care, office buildings in Borgentreich — F90 cladding all-round. Standard scope in Borgentreich.

Standards.

  • MLAR
    Cable line directive

    Governs cladding of cable routes — alongside penetration plans, in stock documentation, in new build.

  • abZ
    Building-authority approval

    Every cladding with approval and conformity declaration.

  • EN 13501-2
    EU classification

    EI ratings for claddings — parallel to DIN, EU-recognised.

  • DIN 4102-4
    Components under fire

    F30/F90/F120 classification — the foundation, building-authority recognised, in stock and new build.

What fire claddings cost in Borgentreich.

Heavily dependent on component and area — fixed price after survey.

  • from €60/m
    Steel beam F30 board claddingPer linear metre, three-sided
  • €120 – €250/m²
    Duct cladding F90All-round, in line
  • from €80/m²
    Shaft wall F90Lift shaft / service
  • Fixed price
    Timber-beam upgradeLump-sum after walkthrough in Borgentreich
  • On request
    Fire-protective coatingPer m² visible area, intumescent

Fixed offer after survey in Borgentreich.

Claddings in Borgentreich — FAQ.

  • Yes — F30/F90 retrofit-able, cladding around existing components, in occupied rooms in Borgentreich.

Plan claddings for Borgentreich.

Survey in Borgentreich → board order → install. Documentation audit-ready.

Call+49 2861 8114387