Fire-stop penetration seals in Anröchte

Wall and ceiling penetrations in Anröchte sealed audit-ready, installed to approval, tracked in penetration plans for the consultant's sign-off.

Promat · Hilti · WürthExisting & newAudit-ready documentation
Anröchte

What a penetration seal achieves.

Penetration seals are approved closures of wall and ceiling openings. They prevent fire and smoke spread for the same duration the wall itself is rated for — 30, 60 or 90 minutes. Without a seal, every cable, pipe or duct that crosses the wall becomes a weak point for flames and smoke.

Penetration systems for Anröchte.

The system depends on opening size, occupancy density and wall type.

  1. 01

    Duct fire-stop

    Fire damper or duct seal — coordinated with the concept, integrated into the duct line.

  2. 02

    Cable seal in wall

    Classic in Anröchte stock: cables through F30/F90 wall, mineral wool with coating or board with collars. Audit-ready in Anröchte.

  3. 03

    Stock documentation

    Take over multi-brand stock in Anröchte, consolidate in the penetration plan, prepare for consultant sign-off.

  4. 04

    Pipe penetration

    Intumescent collar for plastic pipes, mineral wool insulation for steel — system-dependent, per approval, documented in the penetration plan.

  5. 05

    Cable seal in ceiling

    Vertical penetration — usually box-style, accessible from above, expandable for future cables.

  6. 06

    Combined seal

    Cable and pipe in the same opening — Promat combination, Hilti CFS-CT, Würth fire-stop solution. Specified per approval in Anröchte.

Where we install seals in Anröchte.

Cable trays
Tray penetrations with box seals or aggregate seals. Standard scope in Anröchte.
Stock survey
Take over multi-brand stock in Anröchte, inspect, transfer into penetration plan, prepare for authorities. Standard scope in Anröchte.
Duct lines
Fire dampers, duct seals — schools, care, offices in Anröchte. Standard scope in Anröchte.
Stairwell walls
Compartment boundaries with cable and pipe penetrations — mandatory at every building permit in Anröchte. Standard scope in Anröchte.
Plant rooms
Boiler, distribution, transformer — high penetration density, consultant focus.
Riser shafts
Floor-by-floor sealing — renovation, stock, retrofit in Anröchte. Standard scope in Anröchte.

Standards.

  • DIN 4102-9
    Cable penetration seals

    Defines the S-rating for cable seals in Anröchte buildings.

  • abZ
    Building-authority approval

    Every system carries an approval number — we deliver the documentation in Anröchte.

  • EN 1366-3
    European classification

    EI rating for penetration seals — used parallel to DIN, EU-recognised.

  • MLAR
    Cable line directive

    Governs electrical line routing in fire protection — applies in NRW.

What penetration seals cost in Anröchte.

Ranges depend on opening size, density and system. Fixed quote after walkthrough.

  • from €80
    Small cable penetrationSingle cable, S30 with coating
  • €150 – €400
    Standard wall cable sealMineral wool + coating, medium density
  • €300 – €800
    Combined sealCable and pipe in one opening
  • from €600
    Duct fire-stopFire damper installed
  • Fixed price
    Stock survey & penetration planLump-sum after walkthrough in Anröchte

Fixed offer after walkthrough in Anröchte.

Fire stops in Anröchte — FAQ.

  • A penetration plan documents every seal in the building — location, system, date, installer. Mandatory for public buildings, special-use, larger properties in Anröchte.

Have your seals checked for Anröchte.

Call us — we take over the seal stock in Anröchte and continue it.

Call+49 2861 8114387