Boiler rooms ≥ 100 kW
FeuV NRW mandates T60 for boiler and fuel storage rooms from 100 kW rated load.
60 minutes fire resistance — the requirement for boiler rooms, transformer stations, archives, lift lobbies and industrial areas with elevated fire loads. EI₂60 classification in accordance with the applicable proofs of usability / T60 in accordance with the applicable proofs of usability. Certified as a full system: leaf, frame, hardware, seals.

A T60 fire door withstands fire and heat for at least 60 minutes in the standard fire test in accordance with the applicable proofs of usability, classified in accordance with the applicable proofs of usability as EI₂60 or nationally as T60 in accordance with the applicable proofs of usability. T60 is typical for boiler rooms ≥ 100 kW, oil storage, transformer stations, archives and fire-wall penetrations between compartments. With "-RS" addition, also smoke-tight in accordance with the applicable proofs of usability.
Which variant fits depends on the installation context, the existing building and the fire-protection concept — we advise per project.
Cost-efficient solution for the most common installation contexts — tested systems from established manufacturers.
For non-standard sizes, installation contexts or higher requirements driven by the fire-protection concept or expert reports.
Recertification of existing components or phased replacement — coordinated around live operations.
All prices excl. VAT. Maintenance contracts are quoted on a per-unit basis.
We cover every typical building type — from residential to industrial complexes with hundreds of components per site.
FeuV NRW mandates T60 for boiler and fuel storage rooms from 100 kW rated load.
Switchgear, transformers, UPS rooms — T60 separates technical areas from flight paths.
Document-safe with T60; often combined with RC3/RC4 burglary resistance.
Separation of production from storage with high fire loads, hazardous goods, lithium battery storage.
National classification for fire-resistant door assemblies with 60-minute rating.
Integrity (E) and insulation (I) in the European system.
Additional "-RS" requirement for escape and rescue routes.
Mandates T60 for boiler and fuel-storage rooms from 100 kW.
NRW-wide, exclusively with our own installers — no subcontractors.
Aachen to Bielefeld, Lower Rhine to Sauerland — survey usually within five working days.
No subcontractors. Warranty work and maintenance always trace back to the same people.
We schedule appointments proactively. Inspection record for the fire authority comes with every visit.
Building-code check: T60 or T90? Smoke-tight? Panic hardware? Clarified before tendering.
Per manufacturer certificate (abZ/aBG). Anchors, backfill, interface — fully documented.
Functional checks of hold-open controllers, seals, closers, handles, locks — with inspection protocol.
We measure on site, review the building-code requirement and deliver the right system — installed and documented.